English translation for "auxiliary dam"
|
- 辅助坝
辅助水坝 副坝
Related Translations:
- Example Sentences:
| 1. | Analysis of phreatic line monitoring data in auxiliary dam of biliuhe reservoir 碧流河水库一副坝浸润线监测资料分析 | | 2. | Core wall construction management for the auxiliary dam of the fengcheng upper reservoir 风城高库北副坝心墙施工控制 | | 3. | Analysis and application of result from test on weak expansive soil for construction of linhuaigang auxiliary dam 临淮岗副坝弱膨胀土填料试验成果分析及应用 | | 4. | The characteristic analysis of quantity variation of seepage on the stone masonry dam auxiliary dam of sheshang reservoir 跃进水库坝上游护坡破坏原因分析及加固措施 | | 5. | During the construction of concrete cut - off wall of the auxiliary dam in huangbizhuang reservoir , in the section with complex geographical condition , especially the closure section of concrete cut - off wall ( about 120m ) , the deterioration of the underground water ' s flow state and the existence of the overseep channel in the stratum result in the several collapses in the dam crest . through the analysis of ever } 1 collapse ' s reason , the proposal of handling measure and its effect , the paper expounds and proves that the cut - off wall can be safely constructed and devoted into normal usage after dealing with collapse . the psper improves the construction technique and method of concrete cut - off wall especially under complex geological condition and in the overseep stratum 本文通过对历次塌坑的原因分析及历次塌坑处理措施的提出和对历次塌坑处理效果的分析,论证了塌坑处理后防渗墙能安全施工和投入正常运用;完善了在复杂地质条件及强渗漏地层混凝土防渗墙的施工工艺和施工方法;提出了对病险水库加固及在地质条件复杂地层中修建混凝土防渗墙的施工要点;同时提出了在强渗漏地层修建防渗墙的关键是在防渗墙施工前通过预注浆封闭强渗漏通道的重要论点;对塌坑一些处理措施中的不足之处亦进行了分析研究,供国内类似工程借鉴。 | | 6. | The construction of phase iii started in september 1935 and was completed in 1939 , when the third cross - harbour pipeline had been laid . this phase included the laying of twin cross - harbour pipelines that connected kowloon and hong kong island , the building of the tunnel and pumping station , the heightening of the main dam from 115 ft . to 275 ft . and the construction of an auxiliary dam , named the pineapple pass dam 第三期工程于1935年9月展开,至1939年第三条海底输水管建成后才告完工,主要工程包括两条连接九龙至香港的海底输水管、连接水塘与供水网络的输水隧道、抽水机、主坝由115尺加高至275尺,以及兴建82尺高的菠萝凹副坝。 | | 7. | Through the analysis of the status of huangbizhuang reservoir and other problems , such as its destruction caused by water seeping , and with the reference to the internal successful application , the project adopted the measure of constructing concrete cut - off wall on body and foundation of the auxiliary dam between stake no . 0 + 840 and stake no . 5 + 740 通过分析黄壁庄水库现状及存在的渗透破坏等问题,类比国内成功的工程实例,本工程副坝在桩号0 + 840至5 + 700采用在坝体和坝基建混凝土防渗墙处理措施。 |
- Similar Words:
- "auxiliary cutting plane" English translation, "auxiliary cutting surface" English translation, "auxiliary cylinder" English translation, "auxiliary cylinder body" English translation, "auxiliary dairy" English translation, "auxiliary data" English translation, "auxiliary data annotation sets" English translation, "auxiliary data base" English translation, "auxiliary data display board" English translation, "auxiliary data processing equipment" English translation
|
|
|